The I‐285/SR 400 Interchange Reconstruction project proposes operational improvements along I‐285 and SR 400 at and leading up to the interchange. The proposed improvements include construction of barriers separated collector‐distributor (CD) lanes along I‐285 and SR 400, reconstruction of existing ramps, and construction of new flyover bridges, as well as reconstruction and widening of existing bridges in the interchange area.
-There will be no formal presentations at these meetings. The displays at both meeting times will be the same.
Where: Congregation B’nai Torah
700 Mt. Vernon Road, Sandy Springs, GA 30328
When: February 5, 2015 11am to 1pm and 4pm to 8pm